Portal BASE · ID 8344312
894 days between signing and publication
Município de Vila Franca de Xira EMPREITADA DE REABILITAÇÃO DE PRÉDIOS NO PARQUE HABITACIONAL MUNICIPAL EM ARCENA - ALVERCA DO RIBATEJO
Who contracts with whom?
Recorded contract value56,060.00 € legacy reported value
These are contract records, not verified payments or an estimate of money received by each supplier.
Signed 2019-06-06 Published 2021-11-16 894 days between the recorded signing and publication dates.
Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.
894 days between signing and publication
Signing is recorded on 2019-06-06 and publication on 2021-11-16, an interval of 894 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body What explains the gap between the recorded signing and publication dates?
Documents and records to verify Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
The recorded price fields
Base price / estimate 72,810.00 €
Contractual price Not available
Reported final price 56,060.00 €
Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.
Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.
Main suppliers Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details Procedure Concurso público CPV 45454100 Contract Type Empreitadas de obras públicas Location Portugal, Lisboa, Vila Franca de Xira Publication 2021-11-16 Celebration 2019-06-06
Data coverage Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence Rule A2/A3 late publication: 894 days after signing (threshold: 10) Publication Date 2021-11-16 Signing Date 2019-06-06 Days Late 894 A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available
Experimental indicators and advanced analysis A5 · Proximity to configured amounts Base value lies within 5% below one of the configured comparison amounts. Proximity alone does not establish splitting or a legal violation.
Source evidence Rule A5 threshold splitting: price within 5% below 75000.0 Base price 72810.0 Threshold 75000.0 A5_THRESHOLD_SPLITTING · MEDIUM · 2026-03-06 · Not available
How it works · Read a public contract