SIMDOURO - Saneamento do Grande Porto, SAAR0011-P2 Projeto de beneficiação do sistema de proteção ao choque hidráulico das estações elevatórias de Gaia Litoral
- Estudo Prévio
- Projeto de Execução
Signing is recorded on 2019-12-17 and publication on 2020-03-02, an interval of 76 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.