Portal BASE · ID 5825490

53 days between signing and publication

EGEAC - Empresa de Gestão de Equipamentos e Animação Cultural, EM, SACoprodução e apresentação da instalação "Cattivo" de Marlene Freitas - SLTM

Who contracts with whom?

Recorded contract value22,000.00 €legacy reported value
Recorded suppliersBoca Associação Cultural

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

53 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

53 days between signing and publication

Signing is recorded on 2019-07-18 and publication on 2019-09-09, an interval of 53 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
22,000.00 €
Contractual price
Not available
Reported final price
22,000.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Ajuste Direto Regime Geral
CPV
92000000
Contract Type
Aquisição de serviços
Location
Portugal, Lisboa, Lisboa
Publication
2019-09-09
Celebration
2019-07-18

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 53 days after signing (threshold: 10)
Publication Date
2019-09-09
Signing Date
2019-07-18
Days Late
53

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

How it works · Read a public contract