VRSA - Sociedade de Gestão Urbana, EM, ASAquisição de produtos para tratamento dos relvados naturais do Complexo Desportivo de Vila Real de Santo António, em regime de fornecimento contínuo, por lotes, para o ano de 2019.
Signing is recorded on 2019-07-17 and publication on 2019-08-12, an interval of 26 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.