CERCIPORTALEGRE - Cooperativa de Educação e Reabilitação de Cidadãos com Incapacidades de Portalegre CRLPrestação de serviços de internet 4G até 40Mbps com limite mínimo de 25 Mbps
Signing is recorded on 2019-07-30 and publication on 2020-06-17, an interval of 323 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.