Portal BASE · ID 6562789

147 days between signing and publication

União das Freguesias de Venda do Pinheiro e Santo Estêvão das GalésCombustíveis (gasóleo, gasolina)

Who contracts with whom?

Recorded contract value1,728.00 €legacy reported value
Recorded suppliersPETROGAL, S.A.

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

147 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

147 days between signing and publication

Signing is recorded on 2019-12-18 and publication on 2020-05-13, an interval of 147 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
1,728.00 €
Contractual price
Not available
Reported final price
1,728.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Consulta Prévia
CPV
09130000
Contract Type
Aquisição de bens móveis
Location
Portugal, Lisboa, Mafra
Publication
2020-05-13
Celebration
2019-12-18

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 147 days after signing (threshold: 10)
Publication Date
2020-05-13
Signing Date
2019-12-18
Days Late
147

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

How it works · Read a public contract