ACISAT - Associação Empresarial do Alto TâmegaAquisição de Apólices de Seguros de Acidentes Pessoais para Formandos, abrangidos pelo projeto POISE-01-3524-FSE-002582, Formação Modular para empregados e Desempregados – CIF – Candidatura Integrada de Formação da CCP, financiado pelo POISE.
Signing is recorded on 2019-03-13 and publication on 2019-04-03, an interval of 21 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details
Procedure
Ajuste Direto Regime Geral
CPV
66512100
Contract Type
Aquisição de serviços
Location
Portugal, Vila Real, Valpaços
Portugal, Vila Real, Vila Pouca de Aguiar
Portugal, Vila Real, Montalegre
Portugal, Vila Real, Ribeira de Pena
Portugal, Vila Real, Chaves
Portugal, Vila Real, Boticas
Publication
2019-04-03
Celebration
2019-03-13
Data coverage
Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags
An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication
Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence
Rule
A2/A3 late publication: 21 days after signing (threshold: 10)
Publication Date
2019-04-03
Signing Date
2019-03-13
Days Late
21
A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available