Portal BASE · ID 5224382

13 days between signing and publication

Município de São Brás de AlportelO procedimento tem como objeto: Fornecimento Continuo de Produtos de Mercearia e Congelados para as Cantinas Escolares para o Ano 2019

Who contracts with whom?

Recorded contract value20,144.00 €legacy reported value

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

13 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

13 days between signing and publication

Signing is recorded on 2019-01-24 and publication on 2019-02-06, an interval of 13 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
48,100.00 €
Contractual price
Not available
Reported final price
20,144.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Consulta Prévia
CPV
15800000
Contract Type
Aquisição de bens móveis
Location
Portugal, Faro, São Brás de Alportel
Publication
2019-02-06
Celebration
2019-01-24

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 13 days after signing (threshold: 10)
Publication Date
2019-02-06
Signing Date
2019-01-24
Days Late
13

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

Experimental indicators and advanced analysis

A9 · Abnormal Price Reduction

Reported final price is below half the positive base price. A reduction is descriptive and requires source review.

Source evidence
Rule
A9 price reduction: ratio 0.4188 outside [0.5, 1.5]
Base price
48100.0
Total effective price
20144.0
Ratio
0.4188

A9_PRICE_REDUCTION · LOW · 2026-03-06 · Not available

How it works · Read a public contract