IPATIMUP - Instituto de Patologia e Imunologia Molecular da Universidade do PortoAquisição de 6 (seis) switches para expansão da infraestrutura de acesso à rede informática do i3S
Signing is recorded on 2018-08-06 and publication on 2019-01-04, an interval of 151 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.