Portal BASE · ID 4379558

67 days between signing and publication

Agrupamento de Escolas Rio Arade, LagoaFrango do campo Espetadas de perú Bife de frango panado Bife de frango tipo “pronto a cozinhar” Bife de Perú tipo “pronto a cozinhar” Frango inteiro sem miúdos tipo “pronto a cozinhar” Frango inteiro sem miúdos tipo “pronto a cozinhar” Até 850 g Peito de frango tipo “pronto a cozinhar” Pato inteiro sem miúdos tipo “pronto a cozinhar” Perna de frango refrigerada Perna de perú refrigerada Peito de perú tipo “pronto a cozinhar”

Who contracts with whom?

Recorded contract value21,113.00 €legacy reported value
Recorded suppliersMeigal Alimentação ,SA

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

67 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

67 days between signing and publication

Signing is recorded on 2018-01-19 and publication on 2018-03-27, an interval of 67 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
23,284.00 €
Contractual price
Not available
Reported final price
21,113.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Ajuste Direto Regime Geral
CPV
15112000
Contract Type
Aquisição de bens móveis
Location
Portugal, Faro, Lagoa
Publication
2018-03-27
Celebration
2018-01-19

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A1 · Repeat Direct Award

At least two direct awards to the same buyer and supplier in the current and two previous calendar years, with base values reaching the configured €20,000 services/goods or €30,000 works amount.

Source evidence
Rule
A1 repeat direct award: 3 awards within 36 months
Number of Awards
3

A1_REPEAT_DIRECT_AWARD · HIGH · 2026-03-06 · Not available

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 67 days after signing (threshold: 10)
Publication Date
2018-03-27
Signing Date
2018-01-19
Days Late
67

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

How it works · Read a public contract