Portal BASE · ID 5301033

99 days between signing and publication

Serviços Municipalizados de Viana do CasteloContrato publico de fornecimento à candidatura PO-SEUR 03 1911 FC 000012: equipamentos de deposição seletiva de rub's (ação i.1) equipamentos de deposição seletiva de rub's para utilizadores domésticos (açãoi.5); implementação do sistema de gestão payt/sayt (ação i.3)

Who contracts with whom?

Recorded contract value88,750.00 €legacy reported value

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

99 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

99 days between signing and publication

Signing is recorded on 2018-11-22 and publication on 2019-03-01, an interval of 99 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
1,060,543.00 €
Contractual price
Not available
Reported final price
88,750.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Concurso público
CPV
34928480
Contract Type
Aquisição de bens móveis
Location
Portugal, Viana do Castelo, Viana do Castelo
Publication
2019-03-01
Celebration
2018-11-22

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 99 days after signing (threshold: 10)
Publication Date
2019-03-01
Signing Date
2018-11-22
Days Late
99

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

Experimental indicators and advanced analysis

A9 · Abnormal Price Reduction

Reported final price is below half the positive base price. A reduction is descriptive and requires source review.

Source evidence
Rule
A9 price reduction: ratio 0.0837 outside [0.5, 1.5]
Base price
1060543.0
Total effective price
88750.0
Ratio
0.0837

A9_PRICE_REDUCTION · LOW · 2026-03-06 · Not available

How it works · Read a public contract