Associação Empresarial da Região de ViseuAquisição de serviços de " Desenvolvimento de uma Aplicação Eletrónica para a MOSTRA EMPRESARIAL 4INOVA.PT on-line"., no âmbito do Sistema de Apoio a Ações Coletivas - Internacionalização, Programa Operacional da Competitividade e Internacionalização, Operação com o código POCI-02-0853-FEDER-016192.
Signing is recorded on 2018-01-04 and publication on 2018-03-27, an interval of 82 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details
Procedure
Ajuste Direto Regime Geral
CPV
72421000
Contract Type
Aquisição de serviços
Location
Portugal, Distrito não determinado, Concelho não determinado
Publication
2018-03-27
Celebration
2018-01-04
Data coverage
Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags
An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A1 · Repeat Direct Award
At least two direct awards to the same buyer and supplier in the current and two previous calendar years, with base values reaching the configured €20,000 services/goods or €30,000 works amount.
Source evidence
Rule
A1 repeat direct award: 3 awards within 36 months
Number of Awards
3
A1_REPEAT_DIRECT_AWARD · HIGH · 2026-03-06 · Not available
A2 · Late Publication
Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence
Rule
A2/A3 late publication: 82 days after signing (threshold: 10)
Publication Date
2018-03-27
Signing Date
2018-01-04
Days Late
82
A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available
Experimental indicators and advanced analysis
A9 · Abnormal Price Reduction
Reported final price is below half the positive base price. A reduction is descriptive and requires source review.
Source evidence
Rule
A9 price reduction: ratio 0.2484 outside [0.5, 1.5]
Base price
15800.0
Total effective price
3925.0
Ratio
0.2484
A9_PRICE_REDUCTION · LOW · 2026-03-06 · Not available