Escola Secundária Quinta das Flores1 - Pelo presente contrato e seus anexos, que deste fazem parte integrante, estabelecem-se as condições a ques e deve subordinar o fornecimento de besn alimentars a efetuar por PAC & BOM - Comércio & Serviços, Lda.
2 - Durante o período de vigência do presente contrato, ano económico de 2018, podem as partes estabelecer outro tipo de contratos ou acordos, por escrito, que complementem as condições nestes estipulados.
Signing is recorded on 2017-12-27 and publication on 2018-05-21, an interval of 145 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details
Procedure
Ajuste Direto Regime Geral
CPV
15500000
Contract Type
Aquisição de bens móveis
Location
Portugal, Coimbra, Coimbra
Publication
2018-05-21
Celebration
2017-12-27
Data coverage
Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags
An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A1 · Repeat Direct Award
At least two direct awards to the same buyer and supplier in the current and two previous calendar years, with base values reaching the configured €20,000 services/goods or €30,000 works amount.
Source evidence
Rule
A1 repeat direct award: 3 awards within 36 months
Number of Awards
3
A1_REPEAT_DIRECT_AWARD · HIGH · 2026-03-06 · Not available
A2 · Late Publication
Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence
Rule
A2/A3 late publication: 145 days after signing (threshold: 10)
Publication Date
2018-05-21
Signing Date
2017-12-27
Days Late
145
A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available
Experimental indicators and advanced analysis
A9 · Price Overrun
Reported final price divided by a positive base price exceeds 1.5; high priority begins at 2.0. Only reimported records with separate contractual prices are compared.
Source evidence
Rule
A9 price increase: ratio 27.312 outside [0.5, 1.5]
Base price
13530.0
Total effective price
369532.0
Ratio
27.312