Portal BASE · ID 4042747

73 days between signing and publication

DRCAlgarve - Direcção Regional da Cultura do Algarve 600019527 - DGARQ - Direcção-Geral de Arquivos (Serviços Centrais) 600053334 - Ministério da Cultura Secretaria-Geral 600022242 - Arquivo Distrital da Guarda 501492275 - IGESPAR - Instituto de Gestão do Património Arquitectónico e Arqueológio, I.P. 508200237 - IMC - Instituto dos Museus e da Conservação, I.P.Acompanhamento Arqueológico da Empreitada de Reabilitação do Monumento Alcalar 9 e Área Envolvente

Who contracts with whom?

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

73 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

73 days between signing and publication

Signing is recorded on 2017-10-09 and publication on 2017-12-21, an interval of 73 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
9,700.00 €
Contractual price
Not available
Reported final price
9,360.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Ajuste Direto Regime Geral
CPV
45111300
Contract Type
Empreitadas de obras públicas
Location
Portugal, Faro, Portimão
Publication
2017-12-21
Celebration
2017-10-09

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 73 days after signing (threshold: 10)
Publication Date
2017-12-21
Signing Date
2017-10-09
Days Late
73

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

How it works · Read a public contract