Município de Póvoa de Varzim Serviços de intervenção na Fonte da Lota
Who contracts with whom?
Recorded contract value36,500.00 € legacy reported value
These are contract records, not verified payments or an estimate of money received by each supplier.
Signed 2017-09-13 Published 2018-01-08 117 days between the recorded signing and publication dates.
Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.
117 days between signing and publication
Signing is recorded on 2017-09-13 and publication on 2018-01-08, an interval of 117 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body What explains the gap between the recorded signing and publication dates?
Documents and records to verify Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
The recorded price fields
Base price / estimate 37,500.00 €
Contractual price Not available
Reported final price 36,500.00 €
Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.
Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.
Main suppliers Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details Procedure Ajuste Direto Regime Geral CPV 50500000 Contract Type Aquisição de serviços Location Portugal, Porto, Póvoa de Varzim Publication 2018-01-08 Celebration 2017-09-13
Data coverage Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence Rule A2/A3 late publication: 117 days after signing (threshold: 10) Publication Date 2018-01-08 Signing Date 2017-09-13 Days Late 117 A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available