Portal BASE · ID 3139816
157 days between signing and publication
Escola Básica e Secundária Dr. Ângelo Augusto da Silva Aquisição de bens alimentares
Who contracts with whom?
Recorded contract value2,903.00 € legacy reported value
These are contract records, not verified payments or an estimate of money received by each supplier.
Signed 2016-10-11 Published 2017-03-17 157 days between the recorded signing and publication dates.
Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.
157 days between signing and publication
Signing is recorded on 2016-10-11 and publication on 2017-03-17, an interval of 157 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body What explains the gap between the recorded signing and publication dates?
Documents and records to verify Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
The recorded price fields
Base price / estimate 43,222.00 €
Contractual price Not available
Reported final price 2,903.00 €
Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.
Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.
Main suppliers Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details Procedure Ajuste Direto Regime Geral CPV 15811100 Contract Type Aquisição de bens móveis Location Portugal, Região Autónoma da Madeira, Funchal Publication 2017-03-17 Celebration 2016-10-11
Data coverage Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence Rule A2/A3 late publication: 157 days after signing (threshold: 10) Publication Date 2017-03-17 Signing Date 2016-10-11 Days Late 157 A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available
Experimental indicators and advanced analysis A9 · Abnormal Price Reduction Reported final price is below half the positive base price. A reduction is descriptive and requires source review.
Source evidence Rule A9 price reduction: ratio 0.0672 outside [0.5, 1.5] Base price 43222.0 Total effective price 2903.0 Ratio 0.0672 A9_PRICE_REDUCTION · LOW · 2026-03-06 · Not available
How it works · Read a public contract