Portal BASE · ID 2935550

160 days between signing and publication

Simdouro - Saneamento do Grande Porto, S. A.Manutenção e fornecimento de peças de desgaste para os compressores instalados na ETAR de Gaia Litoral e na ETAR de Ponte da Ribeira

Who contracts with whom?

Recorded contract value0.00 €legacy reported value
Recorded suppliersNo supplier identified in the record

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

160 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

160 days between signing and publication

Signing is recorded on 2016-08-16 and publication on 2017-01-23, an interval of 160 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
75,000.00 €
Contractual price
Not available
Reported final price
0.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Not available

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Ajuste Direto Regime Geral
CPV
50800000
Contract Type
Aquisição de serviços
Location
Portugal, Porto, Vila Nova de Gaia
Publication
2017-01-23
Celebration
2016-08-16

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 3 (5)

Missing fields: contractual price, suppliers

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 160 days after signing (threshold: 10)
Publication Date
2017-01-23
Signing Date
2016-08-16
Days Late
160

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

Experimental indicators and advanced analysis

A9 · Abnormal Price Reduction

Reported final price is below half the positive base price. A reduction is descriptive and requires source review.

Source evidence
Rule
A9 price reduction: ratio 0.0 outside [0.5, 1.5]
Base price
75000.0
Total effective price
0.0
Ratio
0.0

A9_PRICE_REDUCTION · LOW · 2026-03-06 · Not available

How it works · Read a public contract