EMARP - Empresa Municipal de Águas e Resíduos de Portimão, EM, SA EMP 001/16 Remodelação das Infra Estruturas dos Tês Bicos
Who contracts with whom?
Recorded contract value111,603.00 € legacy reported value
These are contract records, not verified payments or an estimate of money received by each supplier.
Signed 2016-05-09 Published 2017-02-22 289 days between the recorded signing and publication dates.
Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.
289 days between signing and publication
Signing is recorded on 2016-05-09 and publication on 2017-02-22, an interval of 289 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body What explains the gap between the recorded signing and publication dates?
Documents and records to verify Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
The recorded price fields
Base price / estimate 149,435.00 €
Contractual price Not available
Reported final price 111,603.00 €
Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.
Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.
Main suppliers Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details Procedure Ajuste Direto Regime Geral CPV 45231300 Contract Type Empreitadas de obras públicas Location Portugal, Faro, Portimão Publication 2017-02-22 Celebration 2016-05-09
Data coverage Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence Rule A2/A3 late publication: 289 days after signing (threshold: 10) Publication Date 2017-02-22 Signing Date 2016-05-09 Days Late 289 A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available
Experimental indicators and advanced analysis A5 · Proximity to configured amounts Base value lies within 5% below one of the configured comparison amounts. Proximity alone does not establish splitting or a legal violation.
Source evidence Rule A5 threshold splitting: price within 5% below 150000.0 Base price 149435.0 Threshold 150000.0 A5_THRESHOLD_SPLITTING · MEDIUM · 2026-03-06 · Not available