ACISAT - Associação Empresarial do Alto TâmegaFornecimento ao Agrupamento de Entidades Adjudicantes de Serviços de Consultoria, de suporte à execução do projeto nas componentes 1 - Avaliação do potencial produtivo e comercial das fileiras Turismo e AgroAlimentar, 2 – Benchmarking internacional para a criação de uma rede colaborativa intersetorial e 5 - Criação da Marca para a Rede ”+Turismo +Sabor” e respetivo Plano de Marketing e Meios", no âmbito do Sistema de Apoio às Ações Coletivas para Territórios de Baixa Densidade – Qualificação, projeto designado “+ TURISMO + SABOR | Alto Tâmega com Sabor”
Signing is recorded on 2016-10-11 and publication on 2016-11-17, an interval of 37 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details
Procedure
Ajuste Direto Regime Geral
CPV
79410000
Contract Type
Aquisição de serviços
Location
Portugal, Vila Real, Chaves
Portugal, Vila Real, Boticas
Portugal, Vila Real, Valpaços
Portugal, Vila Real, Montalegre
Portugal, Vila Real, Vila Pouca de Aguiar
Portugal, Vila Real, Ribeira de Pena
Publication
2016-11-17
Celebration
2016-10-11
Data coverage
Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags
An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication
Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence
Rule
A2/A3 late publication: 37 days after signing (threshold: 10)
Publication Date
2016-11-17
Signing Date
2016-10-11
Days Late
37