Cofre de Previdência da Polícia de Segurança PublicaRemod. de fracção nº10, 3ºDtº (C. Passantes), Subst. Caixilharia Alçado principal, Rep. de terraços, Remod. rede eléctrica e canalização do nº 8, 3º Dtº da R. Dr. Alberto Iria em Olhão
Signing is recorded on 2015-11-30 and publication on 2017-04-07, an interval of 494 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.