NERBA - Núcleo Empresarial da Região de Bragança, Associação EmpresarialServiços integrados no INOVA PME projecto de melhoria empresarial, relativos à candidatura nº 56, no âmbito da qualificação e inovação das PME'S, projecto conjunto do Aviso nº 02/SI/2014
Signing is recorded on 2015-10-13 and publication on 2015-11-12, an interval of 30 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.