Santa Casa da Misericórdia de NordesteContrato de Fiscalização e Coordenação de Segurança da Empreitada de Reabilitação do Edifício da Casa de Trabalho de Nordeste Lar de Crianças e Jovens e Adaptação a Creche
Signing is recorded on 2015-02-23 and publication on 2015-09-11, an interval of 200 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.