Portal BASE · ID 1497513

13 days between signing and publication

MUNICÍPIO DE MANTEIGASFornecimento de Equipamento de Dinamização do Centro Interpretativo e de sensibilização Ambiental (CISA) - Fábrica do Rio

Who contracts with whom?

BuyerMUNICÍPIO DE MANTEIGASNIF 506632946
Recorded contract value74,850.00 €legacy reported value
Recorded suppliersENERAREA

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

13 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

13 days between signing and publication

Signing is recorded on 2015-06-25 and publication on 2015-07-08, an interval of 13 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
74,850.00 €
Contractual price
Not available
Reported final price
74,850.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Ajuste Direto Regime Geral
CPV
31000000
Contract Type
Aquisição de bens móveis
Location
Portugal, Guarda, Manteigas
Publication
2015-07-08
Celebration
2015-06-25

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 13 days after signing (threshold: 10)
Publication Date
2015-07-08
Signing Date
2015-06-25
Days Late
13

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

Experimental indicators and advanced analysis

A5 · Proximity to configured amounts

Base value lies within 5% below one of the configured comparison amounts. Proximity alone does not establish splitting or a legal violation.

Source evidence
Rule
A5 threshold splitting: price within 5% below 75000.0
Base price
74850.0
Threshold
75000.0

A5_THRESHOLD_SPLITTING · MEDIUM · 2026-03-06 · Not available

How it works · Read a public contract