Portal BASE · ID 1421894

23 days between signing and publication

Águas do Oeste, S.A.Prestação de serviços para o controlo analítico do sistema multimunicipal de abastecimento de água e saneamento do Oeste

Who contracts with whom?

BuyerÁguas do Oeste, S.A.NIF 505311593
Recorded contract value123,991.00 €legacy reported value

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

23 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

23 days between signing and publication

Signing is recorded on 2015-03-09 and publication on 2015-04-01, an interval of 23 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
366,000.00 €
Contractual price
Not available
Reported final price
123,991.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Concurso limitado por prévia qualificação
CPV
71900000
Contract Type
Aquisição de serviços
Location
Portugal, Leiria, Alcobaça Portugal, Lisboa, Sobral de Monte Agraço Portugal, Lisboa, Lourinhã Portugal, Leiria, Peniche Portugal, Leiria, Caldas da Rainha Portugal, Leiria, Nazaré Portugal, Leiria, Bombarral Portugal, Lisboa, Cadaval Portugal, Leiria, Óbidos Portugal, Lisboa, Torres Vedras Portugal, Lisboa, Arruda dos Vinhos Portugal, Lisboa, Azambuja Portugal, Lisboa, Alenquer
Publication
2015-04-01
Celebration
2015-03-09

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 23 days after signing (threshold: 10)
Publication Date
2015-04-01
Signing Date
2015-03-09
Days Late
23

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

Experimental indicators and advanced analysis

A9 · Abnormal Price Reduction

Reported final price is below half the positive base price. A reduction is descriptive and requires source review.

Source evidence
Rule
A9 price reduction: ratio 0.3388 outside [0.5, 1.5]
Base price
366000.0
Total effective price
123991.0
Ratio
0.3388

A9_PRICE_REDUCTION · LOW · 2026-03-06 · Not available

How it works · Read a public contract