Portal BASE · ID 1410911
28 days between signing and publication
Associação Cultural de Solidariedade Social de Atalaia e Carvalhal Aquisição de viatura para apoio ao centro de dia e serviço de apoio domiciliário
Who contracts with whom?
Recorded contract value16,065.00 € legacy reported value
These are contract records, not verified payments or an estimate of money received by each supplier.
Signed 2015-02-20 Published 2015-03-20 28 days between the recorded signing and publication dates.
Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.
28 days between signing and publication
Signing is recorded on 2015-02-20 and publication on 2015-03-20, an interval of 28 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body What explains the gap between the recorded signing and publication dates?
Documents and records to verify Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
The recorded price fields
Base price / estimate 16,100.00 €
Contractual price Not available
Reported final price 16,065.00 €
Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.
Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.
Main suppliers Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details Procedure Ajuste Direto Regime Geral CPV 34000000 Contract Type Aquisição de bens móveis Location Portugal, Guarda, Pinhel Publication 2015-03-20 Celebration 2015-02-20
Data coverage Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence Rule A2/A3 late publication: 28 days after signing (threshold: 10) Publication Date 2015-03-20 Signing Date 2015-02-20 Days Late 28 A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available
How it works · Read a public contract