Município de LouresAdaptação de 3 salas para JI e remodelação das Instalações Sanitárias com de uma adaptação para pessoas com mobilidade condicionada.
Signing is recorded on 2014-09-08 and publication on 2014-09-24, an interval of 16 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details
Procedure
Ajuste Direto Regime Geral
CPV
45000000
Contract Type
Empreitadas de obras públicas
Location
Portugal, Lisboa, Loures
Publication
2014-09-24
Celebration
2014-09-08
Data coverage
Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags
An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A1 · Repeat Direct Award
At least two direct awards to the same buyer and supplier in the current and two previous calendar years, with base values reaching the configured €20,000 services/goods or €30,000 works amount.
Source evidence
Rule
A1 repeat direct award: 7 awards within 36 months
Number of Awards
7
A1_REPEAT_DIRECT_AWARD · HIGH · 2026-03-06 · Not available
A2 · Late Publication
Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence
Rule
A2/A3 late publication: 16 days after signing (threshold: 10)
Publication Date
2014-09-24
Signing Date
2014-09-08
Days Late
16
A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available