Portal BASE · ID 1119830

53 days between signing and publication

RNAE - Associação das Agências de Energia e Ambiente (Rede Nacional)A aquisição de serviços “Execução de 33 Estudos Energéticos e Ambientais em PME´s – 2.ª Fase” visa a elaboração de 33 Planos de Racionalização Energética em 33 empresas das regiões Norte, Centro e Alentejo (NUT II) das seguintes CAE´s: 10711 - Panificação 16101 - Serração de madeira 23703 - Fabricação de artigos de granito e de rochas, n.e. 25120 - Fabricação de portas, janelas e elementos similares em metal. Os Municípios e Freguesias alvo do presente projeto (em sede de candidatura) são: 1. Região Norte (Viana do Castelo – Neiva; Braga – Adaúfe; Porto – Ramalde; Vila Nova de Gaia – Avintes); 2. Região Centro (Guarda – São Vicente; Coimbra – Taveiro; Leiria – Leiria; Castelo Branco – Castelo Branco); 3. Região Alentejo (Portalegre – Sé; Évora – Horta das Figueiras; Beja – Santa Maria da Feira). As empresas foram selecionadas no âmbito do serviço “Execução de 33 Estudos Energéticos e Ambientais em PME´s – 1.ª Fase”. Os Estudos Energéticos e Ambientais às 33 empresas selecionadas têm como objetivo a caracterização dos consumos energéticos e identificar possíveis reduções, bem como preparar informação para a elaboração de planos de redução e otimização dos consumos energéticos. Nesta 2.ª Fase o serviço contempla a realização de Planos de Racionalização Energética. No seguimento do levantamento efetuado na 1.ª Fase, são identificadas medidas destinadas a melhorar o desempenho energético do edifício e dos seus respetivos sistemas. As oportunidades de melhoria poderão passar por: • Aspetos de natureza comportamental; • Tecnologias eficientes e aproveitamento de energias renováveis; • Afinação e manutenção de equipamentos existentes; • Outras. Para além das oportunidades de melhoria da eficiência energética da instalação, a equipa de trabalho poderá também sugerir a intervenção ao nível da oferta de energia, pela alteração do mix energético consumido. Neste contexto poderão ser sugeridas ações, tais como: • Renegociação dos contratos de fornecimento de todas as formas de energia; • Substituição de fontes energéticas; • Geração de energia a partir de fontes renováveis; • Geração de energia a partir de efluentes energéticos da instalação; • Gestão de cargas, orientando os consumos de energia elétrica para as horas de menor custo; • Outras.

Who contracts with whom?

Recorded contract value59,325.00 €legacy reported value
Recorded suppliersEngineerable, Lda.

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

53 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

53 days between signing and publication

Signing is recorded on 2014-05-19 and publication on 2014-07-11, an interval of 53 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
59,400.00 €
Contractual price
Not available
Reported final price
59,325.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Ajuste Direto Regime Geral
CPV
71314000
Contract Type
Aquisição de serviços
Location
Portugal, Porto, Porto Portugal, Leiria, Leiria Portugal, Viana do Castelo, Viana do Castelo Portugal, Coimbra, Coimbra Portugal, Évora, Évora Portugal, Braga, Braga Portugal, Guarda, Guarda Portugal, Beja, Beja Portugal, Portalegre, Portalegre Portugal, Castelo Branco, Castelo Branco
Publication
2014-07-11
Celebration
2014-05-19

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 53 days after signing (threshold: 10)
Publication Date
2014-07-11
Signing Date
2014-05-19
Days Late
53

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

How it works · Read a public contract