Portal BASE · ID 1415922
208 days between signing and publication
Associação Seara do Trigo para Pessoas com Deficiência do concelho de Ponta Delgada construção de um ar residencial
Who contracts with whom?
Recorded contract value698,000.00 € legacy reported value
These are contract records, not verified payments or an estimate of money received by each supplier.
Signed 2014-08-29 Published 2015-03-25 208 days between the recorded signing and publication dates.
Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.
208 days between signing and publication
Signing is recorded on 2014-08-29 and publication on 2015-03-25, an interval of 208 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body What explains the gap between the recorded signing and publication dates?
Documents and records to verify Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
The recorded price fields
Base price / estimate 1,029,194.00 €
Contractual price Not available
Reported final price 698,000.00 €
Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.
Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.
Main suppliers Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details Procedure Concurso público CPV 45215200 Contract Type Empreitadas de obras públicas Location Portugal, Região Autónoma dos Açores, Ponta Delgada Publication 2015-03-25 Celebration 2014-08-29
Data coverage Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence Rule A2/A3 late publication: 208 days after signing (threshold: 10) Publication Date 2015-03-25 Signing Date 2014-08-29 Days Late 208 A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available
How it works · Read a public contract