Portal BASE · ID 1460706

269 days between signing and publication

Águas do Mondego S. M. de Abastecimento de Água e Saneamento do Baixo Mondego Bairrada SAFornecimento e Montagem de Equipamento para Correção do Fator Potência

Who contracts with whom?

Recorded contract value21,481.00 €legacy reported value
Recorded suppliersJ. Montenegro, S.A.

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

269 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

269 days between signing and publication

Signing is recorded on 2014-08-26 and publication on 2015-05-22, an interval of 269 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
35,000.00 €
Contractual price
Not available
Reported final price
21,481.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Ajuste Direto Regime Geral
CPV
31711154
Contract Type
Aquisição de bens móveis
Location
Portugal, Coimbra, Coimbra
Publication
2015-05-22
Celebration
2014-08-26

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 269 days after signing (threshold: 10)
Publication Date
2015-05-22
Signing Date
2014-08-26
Days Late
269

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

How it works · Read a public contract