APDL - Administração dos Portos do Douro, Leixões e Viana do Castelo, SAEmpreitada de Terraplenagem, Infra-estruturas e Pavimentação do Pólo 1 (Gonçalves) da Plataforma Logística de Leixões_2.º Adicional
Signing is recorded on 2013-07-22 and publication on 2014-02-05, an interval of 198 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.