Portal BASE · ID 13723612
53 days between signing and publication
Centro Hospitalar Barreiro Montijo, EPE3000009/2026 Consumíveis de electromedicina
53 days between signing and publication
Signing is recorded on 2026-01-05 and publication on 2026-02-27, an interval of 53 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
Buyer
NIF 509186998
- Base price / estimate
- 24,169.00 €
- Contractual price
- Not available
- Reported final price
- 3,412.00 €
Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.
Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.
Main suppliers
Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details
- Procedure
- Consulta Prévia
- CPV
- 33120000
- Contract Type
- Aquisição de bens móveis
- Location
- Portugal, Setúbal, Barreiro
- Publication
- 2026-02-27
- Celebration
- 2026-01-05
Data coverage
Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags
An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication
Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence
- Rule
- A2/A3 late publication: 53 days after signing (threshold: 10)
- Publication Date
- 2026-02-27
- Signing Date
- 2026-01-05
- Days Late
- 53
A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available
Experimental indicators and advanced analysis
A9 · Abnormal Price Reduction
Reported final price is below half the positive base price. A reduction is descriptive and requires source review.
Source evidence
- Rule
- A9 price reduction: ratio 0.1412 outside [0.5, 1.5]
- Base price
- 24169.0
- Total effective price
- 3412.0
- Ratio
- 0.1412
A9_PRICE_REDUCTION · LOW · 2026-03-06 · Not available
How it works · Read a public contract