Portal BASE · ID 11980071

43 days between signing and publication

Algar - Valorização e Tratamentos de Resíduos Sólidos, S.A.Fornecimento de 5 pás carregadoras de rodas nos termos, condições e especificações estabelecidas nas peças de concurso

Who contracts with whom?

Recorded contract value1,014,500.00 €legacy reported value
Recorded suppliersMOVITER-Equipamentos, S.A.

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

43 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

43 days between signing and publication

Signing is recorded on 2025-10-14 and publication on 2025-11-26, an interval of 43 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
1,173,490.00 €
Contractual price
Not available
Reported final price
1,014,500.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Concurso público
CPV
34144710
Contract Type
Aquisição de bens móveis
Location
Portugal, Faro, Loulé
Publication
2025-11-26
Celebration
2025-10-14

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 43 days after signing (threshold: 10)
Publication Date
2025-11-26
Signing Date
2025-10-14
Days Late
43

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

How it works · Read a public contract