Centro Protocolar de Formação Profissional para o Setor da JustiçaEmpreitada de obra pública para o fornecimento e instalação de um sistema de produção fotovoltaica de autoconsumo, no Núcleo de Formação Alcoentre, no âmbito do Investimento RE-C06-i01: Modernização da oferta e dos estabelecimentos de ensino e da formação profissional Subinvestimento Modernização da Formação Profissional do Plano de Recuperação e Resiliência (PRR).
Signing is recorded on 2025-12-11 and publication on 2026-01-23, an interval of 43 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.