Portal BASE · ID 12704212

119 days between signing and publication

Gebalis - Gestão do Arrendamento da Habitação Municipal de Lisboa, EM, SAEMP 17/GEBALIS/2025 - Bairro Alta de Lisboa Centro e Alto Lumiar - Obras de reabilitação de frações de habitação municipal

Who contracts with whom?

Recorded contract value41,000.00 €legacy reported value

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

119 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

119 days between signing and publication

Signing is recorded on 2025-09-23 and publication on 2026-01-20, an interval of 119 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
315,000.00 €
Contractual price
Not available
Reported final price
41,000.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Concurso público
CPV
45453100
Contract Type
Empreitadas de obras públicas
Location
Portugal, Lisboa, Lisboa
Publication
2026-01-20
Celebration
2025-09-23

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 119 days after signing (threshold: 10)
Publication Date
2026-01-20
Signing Date
2025-09-23
Days Late
119

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

Experimental indicators and advanced analysis

A9 · Abnormal Price Reduction

Reported final price is below half the positive base price. A reduction is descriptive and requires source review.

Source evidence
Rule
A9 price reduction: ratio 0.1302 outside [0.5, 1.5]
Base price
315000.0
Total effective price
41000.0
Ratio
0.1302

A9_PRICE_REDUCTION · LOW · 2026-03-06 · Not available

How it works · Read a public contract