Guarda Nacional Republicanarealização de um procedimento contratual de uma empreitada de obras publicas para a substituição da cobertura do refeitório da gnr de viana do castelo
Signing is recorded on 2025-11-13 and publication on 2026-02-25, an interval of 104 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.