Portal BASE · ID 11954180

Transporte Continuado de alunos ESQM- Pavilhão de Sassoeiros, no âmbito da disciplina de Educação Física. Protocolo feito entre a Parque Escolar e Pavilhão de Sassoeiros, está a decorrer 3ª fase obras Parque Escolar, os alunos não tem pavilhão polidesportivo para a prática da disciplina de Educação Física. A escola consultou três transportadoras, apresentou as propostas CMO, a verba foi enviada pelo Munícipio.

Buyer

Escola Secundária da Quinta do Marquês, Oeiras

NIF 600036740

Base price / estimate
23,165.00 €
Contractual price
Not available
Reported final price
23,165.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Ajuste Direto Regime Geral
CPV
60000000
Contract Type
Aquisição de serviços
Location
Portugal, Lisboa, Oeiras
Publication
2025-11-18
Celebration
2025-09-29

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A1 · Repeat Direct Award

At least two direct awards to the same buyer and supplier in the current and two previous calendar years, with base values reaching the configured €20,000 services/goods or €30,000 works amount.

Source evidence
Rule
A1 repeat direct award: 3 awards within 36 months
Number of Awards
3

A1_REPEAT_DIRECT_AWARD · HIGH · 2026-03-06 · Not available

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 50 days after signing (threshold: 10)
Publication Date
2025-11-18
Signing Date
2025-09-29
Days Late
50

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

How it works · Read a public contract