Portal BASE · ID 953781

38 days between signing and publication

Instituto Superior TécnicoReparar a envolvente exterior e tectos falsos interiores do passadiço existente no bloco C; Criar um vão, sem porta, para ligação directa das duas salas dedicadas aos serviços administrativos; Criar um vão, com porta, para ligação da lavandaria à garagem do edifício

Who contracts with whom?

BuyerInstituto Superior TécnicoNIF 501507930
Recorded contract value9,302.00 €legacy reported value
Recorded suppliersJ. Loureiro & Filhos Lda

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

38 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

38 days between signing and publication

Signing is recorded on 2013-12-10 and publication on 2014-01-17, an interval of 38 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
12,600.00 €
Contractual price
Not available
Reported final price
9,302.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Ajuste Direto Regime Geral
CPV
45000000
Contract Type
Empreitadas de obras públicas
Location
Portugal, Lisboa, Lisboa
Publication
2014-01-17
Celebration
2013-12-10

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 38 days after signing (threshold: 10)
Publication Date
2014-01-17
Signing Date
2013-12-10
Days Late
38

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available