Portal BASE · ID 11559600
137 days between signing and publication
Cascais Envolvente - Gestão Social da Habitação, EM, SA 048/2024 Empreitada por lotes para a Reabilitação de 27 fogos municipais do Concelho de Cascais
Who contracts with whom?
Recorded contract value107,468.00 € legacy reported value
These are contract records, not verified payments or an estimate of money received by each supplier.
Signed 2025-02-20 Published 2025-07-07 137 days between the recorded signing and publication dates.
Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.
137 days between signing and publication
Signing is recorded on 2025-02-20 and publication on 2025-07-07, an interval of 137 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body What explains the gap between the recorded signing and publication dates?
Documents and records to verify Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
The recorded price fields
Base price / estimate 640,200.00 €
Contractual price Not available
Reported final price 107,468.00 €
Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.
Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.
Main suppliers Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details Procedure Concurso público CPV 45453000 Contract Type Empreitadas de obras públicas Location Portugal Publication 2025-07-07 Celebration 2025-02-20
Data coverage Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence Rule A2/A3 late publication: 137 days after signing (threshold: 10) Publication Date 2025-07-07 Signing Date 2025-02-20 Days Late 137 A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available
Experimental indicators and advanced analysis A9 · Abnormal Price Reduction Reported final price is below half the positive base price. A reduction is descriptive and requires source review.
Source evidence Rule A9 price reduction: ratio 0.1679 outside [0.5, 1.5] Base price 640200.0 Total effective price 107468.0 Ratio 0.1679 A9_PRICE_REDUCTION · LOW · 2026-03-06 · Not available
How it works · Read a public contract