Portal BASE · ID 805304

185 days between signing and publication

Rumo 2020, E.M.Execução de diversas obras de reparação,construção conservação e beneficiação de bens imoveis(empedramento e calcetamento de ruas e passeios) .

Who contracts with whom?

BuyerRumo 2020, E.M.NIF 507892283
Recorded contract value45,883.00 €legacy reported value
Recorded suppliersNo supplier identified in the record

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

185 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

185 days between signing and publication

Signing is recorded on 2013-01-28 and publication on 2013-08-01, an interval of 185 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

The supplier’s identification is incomplete

The record names no supplier, or one supplier has no tax identifier. This describes incomplete data, not the absence of an award recipient.

Question for the public body

Which supplier and tax identifier appear in the original contract, and why are they missing from the record?

Documents and records to verify

Open the contract and award documents. Ask the public body to identify the recipient and correct or explain the missing fields.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
46,000.00 €
Contractual price
Not available
Reported final price
45,883.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Not available

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Ajuste Direto Regime Geral
CPV
45000000
Contract Type
Empreitadas de obras públicas
Location
Portugal, Santarém, Cartaxo
Publication
2013-08-01
Celebration
2013-01-28

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 3 (5)

Missing fields: contractual price, suppliers

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 185 days after signing (threshold: 10)
Publication Date
2013-08-01
Signing Date
2013-01-28
Days Late
185

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

C1 · Missing Supplier NIF

A recorded supplier has no NIF, or a positive reported final price has no recorded supplier. This describes source completeness.

Source evidence
Rule
C1 no winner recorded: awarded contract (effective price > 0) has no supplier identified