Signing is recorded on 2025-03-24 and publication on 2025-04-04, an interval of 11 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details
Procedure
Consulta Prévia
CPV
50000000
Contract Type
Aquisição de serviços
Location
Portugal, Beja, Serpa
Publication
2025-04-04
Celebration
2025-03-24
Data coverage
Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags
An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication
Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence
Rule
A2/A3 late publication: 11 days after signing (threshold: 10)
Publication Date
2025-04-04
Signing Date
2025-03-24
Days Late
11
A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available
Experimental indicators and advanced analysis
A9 · Price Overrun
Reported final price divided by a positive base price exceeds 1.5; high priority begins at 2.0. Only reimported records with separate contractual prices are compared.
Source evidence
Rule
A9 price increase: ratio 99.5549 outside [0.5, 1.5]
Base price
45000.0
Total effective price
4479971.0
Ratio
99.5549
A9_PRICE_ANOMALY · HIGH · 2026-03-06 · Not available