Portal BASE · ID 717436
11 days between signing and publication
Município de Vila Franca de XiraContratação de serviços de manutenção para três elevadores instalados no Parque Urbano de VFX e Jardim de Infância de Alhandra
11 days between signing and publication
Signing is recorded on 2013-03-08 and publication on 2013-03-19, an interval of 11 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
Buyer
NIF 506614913
- Base price / estimate
- 4,680.00 €
- Contractual price
- Not available
- Reported final price
- 4,536.00 €
Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.
Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.
Main suppliers
Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details
- Procedure
- Ajuste Direto Regime Geral
- CPV
- 50750000
- Contract Type
- Aquisição de serviços
- Location
- Portugal, Lisboa, Vila Franca de Xira
- Publication
- 2013-03-19
- Celebration
- 2013-03-08
Data coverage
Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags
An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication
Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence
- Rule
- A2/A3 late publication: 11 days after signing (threshold: 10)
- Publication Date
- 2013-03-19
- Signing Date
- 2013-03-08
- Days Late
- 11
A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available