Portal BASE · ID 717436

11 days between signing and publication

Município de Vila Franca de XiraContratação de serviços de manutenção para três elevadores instalados no Parque Urbano de VFX e Jardim de Infância de Alhandra

What deserves a closer look

Reporting leads

11 days between signing and publication

Signing is recorded on 2013-03-08 and publication on 2013-03-19, an interval of 11 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

Buyer

Município de Vila Franca de Xira

NIF 506614913

Base price / estimate
4,680.00 €
Contractual price
Not available
Reported final price
4,536.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Ajuste Direto Regime Geral
CPV
50750000
Contract Type
Aquisição de serviços
Location
Portugal, Lisboa, Vila Franca de Xira
Publication
2013-03-19
Celebration
2013-03-08

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 11 days after signing (threshold: 10)
Publication Date
2013-03-19
Signing Date
2013-03-08
Days Late
11

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

How it works · Read a public contract