Signing is recorded on 2025-01-06 and publication on 2025-02-14, an interval of 39 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
Only one bidder appears in the record
The participation field records one bidder. Missing participation data is not treated as one bidder, and does not reveal how many companies could have participated.
Question for the public body
Which bids were submitted, admitted or excluded, and how was the opportunity advertised?
Documents and records to verify
Confirm the procedure and request the notice, tender documents and bid evaluation report.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details
Procedure
Consulta Prévia
CPV
15810000
Contract Type
Aquisição de bens móveis
Location
Portugal, Coimbra, Montemor-o-Velho
Publication
2025-02-14
Celebration
2025-01-06
Competition
1 · Bidder Count
Boutique de Pão e Pastelaria Belidoce · 507453182
Data coverage
Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags
An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication
Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence
Rule
A2/A3 late publication: 39 days after signing (threshold: 10)
Publication Date
2025-02-14
Signing Date
2025-01-06
Days Late
39
A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available
A6 · Low Competition
One bidder is recorded. Missing bidder data is not treated as one bidder; the procedure must be checked in the source.
Source evidence
Rule
a6_single_bidder
Bidder count
1
A6_LOW_COMPETITION · MEDIUM · 2026-04-17 · Not available
Experimental indicators and advanced analysis
A9 · Price Overrun
Reported final price divided by a positive base price exceeds 1.5; high priority begins at 2.0. Only reimported records with separate contractual prices are compared.
Source evidence
Rule
A9 price increase: ratio 1.7034 outside [0.5, 1.5]
Base price
20000.0
Total effective price
34067.0
Ratio
1.7034
A9_PRICE_ANOMALY · MEDIUM · 2026-03-06 · Not available