Portal BASE · ID 11062633
19 days between signing and publication
Rádio e Televisão de Portugal, SARTP CP 35/2024 Aquisição sistema de iluminação para o Estúdio A do Centro de Produção Norte e Estúdios 1 e 2 Lisboa
19 days between signing and publication
Signing is recorded on 2024-11-14 and publication on 2024-12-03, an interval of 19 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
Buyer
NIF 500225680
- Base price / estimate
- 2,067,000.00 €
- Contractual price
- Not available
- Reported final price
- 1,878,279.00 €
Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.
Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.
Main suppliers
Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details
- Procedure
- Concurso público
- CPV
- 31527260
- Contract Type
- Aquisição de bens móveis
- Location
- Portugal, Lisboa, Lisboa
- Publication
- 2024-12-03
- Celebration
- 2024-11-14
Competition
3 · Bidder Count
- --Telefonica Servicios Audiovisuales · Identity not normalized
- NOME CODIGO BLUE UNIPESSOAL, LDA · 506223140
- Pantalha - Sistemas de Processamento de Imagem, Lda · 502303298
Data coverage
Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags
An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication
Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence
- Rule
- A2/A3 late publication: 19 days after signing (threshold: 10)
- Publication Date
- 2024-12-03
- Signing Date
- 2024-11-14
- Days Late
- 19
A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available