Portal BASE · ID 11010528

90 days between signing and publication

Assoc. Beneficiários Lezíria Grande Vila Franca XiraAquisição, Fornecimento, Montagem e Colocação em Serviço, de Equipamentos de Telegestão no Aproveitamento Hidroagrícola da Lezíria Grande de Vila Franca de Xira

Who contracts with whom?

Recorded contract value33,076.00 €legacy reported value
Recorded suppliersNo supplier identified in the record

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

90 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

90 days between signing and publication

Signing is recorded on 2024-08-08 and publication on 2024-11-06, an interval of 90 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

Only one bidder appears in the record

The participation field records one bidder. Missing participation data is not treated as one bidder, and does not reveal how many companies could have participated.

Question for the public body

Which bids were submitted, admitted or excluded, and how was the opportunity advertised?

Documents and records to verify

Confirm the procedure and request the notice, tender documents and bid evaluation report.

The supplier’s identification is incomplete

The record names no supplier, or one supplier has no tax identifier. This describes incomplete data, not the absence of an award recipient.

Question for the public body

Which supplier and tax identifier appear in the original contract, and why are they missing from the record?

Documents and records to verify

Open the contract and award documents. Ask the public body to identify the recipient and correct or explain the missing fields.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
45,000.00 €
Contractual price
Not available
Reported final price
33,076.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Not available

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Consulta Prévia
CPV
50000000
Contract Type
Aquisição de serviços
Location
Portugal, Lisboa, Vila Franca de Xira
Publication
2024-11-06
Celebration
2024-08-08

Competition

1 · Bidder Count

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 3 (5)

Missing fields: contractual price, suppliers

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 90 days after signing (threshold: 10)
Publication Date
2024-11-06
Signing Date
2024-08-08
Days Late
90

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

C1 · Missing Supplier NIF

A recorded supplier has no NIF, or a positive reported final price has no recorded supplier. This describes source completeness.

Source evidence
Rule
C1 no winner recorded: awarded contract (effective price > 0) has no supplier identified

C1_MISSING_WINNER_NIF · MEDIUM · 2026-03-06 · Not available

A6 · Low Competition

One bidder is recorded. Missing bidder data is not treated as one bidder; the procedure must be checked in the source.

Source evidence
Rule
a6_single_bidder
Bidder count
1

A6_LOW_COMPETITION · MEDIUM · 2026-04-17 · Not available

How it works · Read a public contract