Universidade de Coimbra24L00207 - Aquisição de licenças de software DreamShaper para os anos letivos 2024/25 e 2025/26, e formação em Aprendizagem Baseada em Projeto para docentes da UC.
Signing is recorded on 2024-10-17 and publication on 2024-11-12, an interval of 26 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.