Portal BASE · ID 10822189

3 direct awards naming the same supplier

Unidade Local de Saúde da Póvoa de Varzim/Vila do Conde, EPECAT E MANUTENÇÃO E SUBSCRIÇÃO SMART GOVERNANCE VNEXT - 2024

Who contracts with whom?

Recorded contract value12,915.00 €legacy reported value

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

134 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

3 direct awards naming the same supplier

CAVEDIGITAL - Consultadoria e Soluções Informáticas, Lda · 2024-01-01 — 2026-04-10

This counts this buyer’s BASE contracts naming the same supplier from 2024-01-01 to 2026-04-10, once per contract. It does not measure payments or each supplier’s allocation.

Inspect these 3 contracts

Question for the public body

What justifies each direct award and how do the contracts’ subject matters relate?

Documents and records to verify

Compare objects, dates and suppliers across the period. Request the award decisions and the stated grounds for the procedure.

134 days between signing and publication

Signing is recorded on 2024-03-04 and publication on 2024-07-16, an interval of 134 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

Only one bidder appears in the record

The participation field records one bidder. Missing participation data is not treated as one bidder, and does not reveal how many companies could have participated.

Question for the public body

Which bids were submitted, admitted or excluded, and how was the opportunity advertised?

Documents and records to verify

Confirm the procedure and request the notice, tender documents and bid evaluation report.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
12,915.00 €
Contractual price
Not available
Reported final price
12,915.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Ajuste Direto Regime Geral
CPV
72200000
Contract Type
Aquisição de serviços
Location
Portugal, Porto, Póvoa de Varzim
Publication
2024-07-16
Celebration
2024-03-04

Competition

1 · Bidder Count

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A1 · Repeat Direct Award

At least two direct awards to the same buyer and supplier in the current and two previous calendar years, with base values reaching the configured €20,000 services/goods or €30,000 works amount.

Source evidence
Rule
A1 repeat direct award: 4 awards within 36 months
Number of Awards
4

A1_REPEAT_DIRECT_AWARD · HIGH · 2026-03-06 · Not available

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 134 days after signing (threshold: 10)
Publication Date
2024-07-16
Signing Date
2024-03-04
Days Late
134

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

A6 · Low Competition

One bidder is recorded. Missing bidder data is not treated as one bidder; the procedure must be checked in the source.

Source evidence
Rule
a6_single_bidder
Bidder count
1

A6_LOW_COMPETITION · MEDIUM · 2026-04-17 · Not available