Associação de Muncipios da Região do Planalto BeirãoPrestação de serviços para elaboração de estudo de alternativas, projeto base, peças do procedimento e análise de propostas de conceção-construção para beneficiação e remodelação das estações de tratamento de água de Mortágua e Tábua
Signing is recorded on 2024-06-17 and publication on 2024-06-28, an interval of 11 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.