Signing is recorded on 2024-02-07 and publication on 2024-03-05, an interval of 27 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details
Procedure
Ajuste Direto Regime Geral
CPV
09100000
Contract Type
Aquisição de bens móveis
Location
Portugal, Faro, Silves
Publication
2024-03-05
Celebration
2024-02-07
Data coverage
Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags
An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication
Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence
Rule
A2/A3 late publication: 27 days after signing (threshold: 10)
Publication Date
2024-03-05
Signing Date
2024-02-07
Days Late
27
A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available
Experimental indicators and advanced analysis
B5 · Benford's Law Deviation
A buyer's first-digit distribution departs from Benford's distribution using chi-square with at least 20 observations. Data selection can invalidate the diagnostic; it is not evidence of fraud.
Source evidence
Rule
B5 Benford's Law deviation: chi-square 24.2621 (df=8, n=25, threshold=15.507)