I3S - Instituto de Investigação e Inovação em Saúde da Universidade do Porto - AssociaçãoAD 22/2023 - Aquisição de Serviços de Manutenção do Sistema GTC das Instalações do i3S
Signing is recorded on 2024-01-11 and publication on 2024-01-31, an interval of 20 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.