Signing is recorded on 2023-09-05 and publication on 2023-09-26, an interval of 21 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details
Procedure
Consulta Prévia
CPV
80000000
Contract Type
Aquisição de serviços
Location
Portugal, Vila Real, Mondim de Basto
Portugal, Braga, Vieira do Minho
Portugal, Braga, Vizela
Portugal, Braga, Guimarães
Portugal, Braga, Fafe
Portugal, Braga, Póvoa de Lanhoso
Portugal, Braga, Vila Nova de Famalicão
Portugal, Braga, Cabeceiras de Basto
Publication
2023-09-26
Celebration
2023-09-05
Data coverage
Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags
An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication
Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence
Rule
A2/A3 late publication: 21 days after signing (threshold: 10)
Publication Date
2023-09-26
Signing Date
2023-09-05
Days Late
21
A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available